Selling a single-family home in Corte Madera sets off three local requirements, and each one runs on a different clock. The fire resale inspection, as required by Central Marin Fire, has to pass before a buyer signs a contract. The Town's building record report has to reach the buyer before closing. Under Ordinance 45, the sewer lateral has to be inspected before title transfers, but the repairs can legally wait until up to 180 days after the sale closes.
That last clock changes how the money moves. The item most likely to carry a large repair bill doesn't have to be fixed before closing. That turns it into a negotiation over price and credits. The cheapest item, the $211 fire inspection, is the one that can actually hold up a signed contract.
Three requirements, three different starting points
Here is the order the deadlines fall in for a typical Corte Madera sale, based on each agency's published rules:
- When you list: Request the Central Marin Fire resale inspection. The department's own guidance says to submit the request as soon as the property is listed. Sanitary District No. 2 also suggests giving the district your sewer lateral inspection report at listing.
- Before the sales contract: The property must have passed the fire inspection within the six months before the contract is signed.
- Before closing: The buyer must receive the Town of Corte Madera's Report of Residential Building Record, and escrow has to get the buyer's written acknowledgment of receipt before closing. The seller must also have the sewer lateral inspected before title transfers.
- Within 180 days after closing: Any required sewer lateral repairs must be completed, no matter whether the buyer or the seller agreed to handle them.
Most generic seller checklists stack these as equal boxes to tick. In Corte Madera, steps one and two decide when you can accept an offer. Step four decides how much that offer ends up being worth.
The fire inspection sets the listing calendar
Central Marin Fire requires an exterior resale inspection for single-family homes and residential parcels in the designated wildland-urban interface, or WUI, of Corte Madera and Larkspur. Individual condominiums and townhouses are exempt. The 2026 fee is $211, and inspectors don't go inside the home. The requirement has applied in Corte Madera since November 5, 2021.
The timing is the hard part. The inspection takes place within 7 to 10 business days of the request, and the notice is emailed within 10 business days. If the property doesn't pass, any issues have to be corrected within 30 days. The department advises finishing all required defensible space work before you submit the request at all. A seller who lists first and calls for the inspection later can end up with an offer in hand and no passing report.
A recent routine inspection doesn't count. The department says a resale inspection is required even if the property had an annual wildfire hazard inspection the same year, because resale inspections require strict compliance. Its enforcement process also grants no exemptions for existing violations at resale.
State law does offer some flexibility. Under AB 38, the buyer and seller can sign a written agreement in which the buyer takes responsibility for getting compliance documentation within one year after escrow closes. The department notes that this agreement doesn't exempt the property. Local code still requires corrections within 30 days. In other words, the one-year state window and the 30-day local rule both apply.
The sewer lateral can be fixed after closing, so it gets negotiated
Sanitary District No. 2's private sewer lateral ordinance, Ordinance 45, has applied to Corte Madera sales since August 4, 2018. The language on who pays is short:
"The responsibility for any repair of a lateral is an issue between the buyer and seller. Regardless of who is responsible for the private sewer lateral repair, such repair shall be completed within 180 days of the close of sale."
Because the district only requires the inspection before transfer, a failed lateral doesn't automatically block a closing. It becomes something the parties negotiate. The seller can repair before listing, offer a credit, or reduce the price, and the buyer weighs any of those against a repair they would own after move-in.
The inspection report itself shapes that negotiation. A licensed plumber has to prepare it, covering defects, illicit stormwater connections and backwater devices, and including a televised video. The district then reviews the report and decides what repairs are needed. If the district issues a Notice to Repair, it must list the defects and set a deadline of up to 180 days. The district aims to make that determination within 15 business days of receiving the report. A seller who gets the report to the district at listing can have that answer before the offers come in.
The video isn't the final word. SD2's 2019 workshop materials say a Certificate of Compliance is issued only after a permitted pressure test passes, and that a CCTV video alone isn't enough. The ordinance spells out the test. Air pressure at 3.5 to 4 psi has to hold with no drop for 15 minutes, or water in an 8-foot riser has to hold its level for one hour.
Skipping the inspection doesn't make the requirement go away. If the seller never inspects, the district requires the new owner to do the inspection and any repairs. The requirement also covers transfers through a trust or other arrangement within the same family, which matters for executors and trust sales.
Recent work can exempt the property, if you have the paperwork
Owners who have already done the work can be exempt. The inspection isn't required if the entire lateral was installed or replaced within the three years before listing, or if a permitted inspection and repair was completed within the prior three years. Proof of a replacement that is 10 years old or newer can be a certificate, a paid bill or other documentation the district accepts.
If you replaced your lateral in the last decade, the plumber's invoice belongs in your seller file. It decides whether the exemption question even comes up, and it gives buyers documentation instead of a guess.
Shared laterals and condominiums have their own provisions. Owners on a shared portion can apply for a one-time 180-day extension, and homeowners associations can apply for a three-year blanket approval when the complex's laterals are inspected together.
The district's cost help runs on its own deadline
SD2 offers assistance that can shift the math of a repair credit. The Private Sewer Lateral Grant covers 50 percent of the repair or replacement cost needed to pass the pressure test, capped at $2,500 per parcel. The cap is $3,500 for parcels on a shared lateral when the work was triggered by another owner on that line. Eligibility isn't based on income. The entire lateral must pass a pressure test within 180 days of the sewer permit being issued, and owners who received any district funding assistance in the past 10 years are disqualified.
For larger repairs, the district's loan program offers up to $25,000 at 6.5 percent annual interest over no more than 10 years, repaid through property tax assessments. The March 2025 application requires a recent CCTV inspection, three bids and a lender's written confirmation that the owner doesn't qualify for a private loan.
All four of SD2's assistance programs are currently set to expire on June 30, 2027. In June 2024 the district board extended them through that date and authorized up to $635,000 per fiscal year across the programs for fiscal years 2024–25 through 2026–27. A seller planning a spring or summer 2027 sale is close to that line.
The Town report is a records check, not an inspection
The third requirement is the simplest. Before a residential property is sold, the owner or agent must get a Report of Residential Building Record from the Town of Corte Madera. The current application lists a $130 fee and a turnaround of about 10 business days. The report discloses the authorized use, occupancy and zoning classifications, and permit history on record. It isn't a physical inspection, and it doesn't represent that the property complies with zoning or other law.
Since it reports permit history, this is where unpermitted work tends to come up. Ordering it at listing, alongside the fire inspection request, gives the seller time to answer questions before a buyer asks them in escrow. The same Town application is also how Corte Madera owners request the fire resale inspection.
Confirm your sewer district before you start
A Corte Madera address doesn't settle which sanitary district's rules apply. SD2 serves Corte Madera and parts of neighboring areas. Ross Valley Sanitary District lists Larkspur, Ross, San Anselmo, Fairfax and nearby unincorporated areas. The two districts have different rules. RVSD requires a Certificate of Compliance for a sale and gives the new owner 90 days after escrow closes to comply. An RVSD certificate is valid for 20 years. RVSD's grant guide, updated April 23, 2026, offers qualified owners up to $3,000 toward a lateral replacement. Confirm your parcel number with the district before you plan around either set of deadlines.
A few common questions
Does a condo or townhouse in Corte Madera need the fire resale inspection?
No. Central Marin Fire exempts individual condominiums and townhouses. The requirement applies to single-family homes and residential parcels in the designated WUI.
If I'm not selling, do the fire code corrections still apply?
Yes. The department states that compliance is required at all times, regardless of a sale.
Does Corte Madera add its own transfer tax?
The Marin County Recorder's fee table lists the county documentary transfer tax at $0.55 per $500 of value, less assumed liens, for all areas. The only additional city tax it lists is San Rafael's, not Corte Madera's.
This information describes local procedures and isn't legal advice. Get your sewer repair deadline from the district in writing for your specific property.
If you're thinking about selling in Corte Madera, the most useful conversation happens before the listing date, while there's still time to order the fire inspection, file the Town report, and get the sewer report to the district. Jennifer Bowes will help you line up all three clocks, from listing day through the 180-day repair window. Schedule a consultation and we'll map out your timeline.